Clark County Public Works and Vancouver-Clark Parks and Rec invite Vancouver cyclists to learn more about the preliminary design work for the first 2.7 miles of the new trail. The segment will extend from Fairgrounds Park in Battle Ground to NE 249th St near Battle Ground Lake State Park.
Click on the map to see an enlarged image.
The proposed design places a 10 to 12-foot shared path and a 6-foot equestrian trail to the right of the tracks.
Project staff will present the design to Battle Ground City Council on Monday, July 20. A public open house is scheduled on August 13 from 6:30 to 8:30 pm at Battle Ground Community Center, 912 E Main St in Battle Ground.
