This interactive map created by Paul Fyfield, cartographer and BTA volunteer, shows how much Portland’s bike network would increase in coverage and connectivity when the entire 2030 Bike Plan is built. Here are the basics:
Existing facilities come to within a quarter mile of 57%, or approximately 45.6 out of 79.5 square miles, of areas zoned residential or mixed commercial / residential.
Existing and funded facilities: 68% or 52.2 miles
Existing, funded, and planned facilities: 97% or 77 miles
Click to download PDF (17.7 MB – large!)
Note: This is a geospatial PDF. Acrobat Reader 9.0 or later is required to take advantage of its features. Click Tools >Analysis >Show Analysis Toolbar to access location and measurement tools. Click View >Naviation Panels to access layers.

The Klickitat Bike route now goes on Morris from Vancouver to 7th, Then Siskyou to 17th, then Klickitat.